The Tel Aviv rail network
Route length in kilometres
- Tel Aviv Light Rail Red LineOperating24
- Tel Aviv Light Rail Purple LineUnder construction27
- Tel Aviv Light Rail Green LineUnder construction39
Transportation
23 entries
Railways, urban transit, roads, ports and airports, with operating projects distinguished from planned works.
Tel Aviv Light Rail Red Lineהקו האדום של הרכבת הקלה בגוש דן
The Red Line opened in August 2023, linking Petah Tikva, Bnei Brak, Ramat Gan, Tel Aviv–Yafo and Bat Yam. Its 24-kilometre route has 34 stations, including ten underground stations. NTA developed the line and Tevel operates it. It is the first operating line of the Dan region’s light-rail network.
Sources:12Tel Aviv Light Rail Purple Lineהקו הסגול של הרכבת הקלה בגוש דן
The Purple Line is being built as a surface light-rail route from central Tel Aviv to eastern communities including Ramat Gan, Kiryat Ono, Or Yehuda and Yehud–Monosson. NTA’s updated plan describes a 27-kilometre route and targets opening in 2028. Construction and procurement are ongoing; the line is not yet carrying passengers.
Sources:12Tel Aviv Light Rail Green Lineהקו הירוק של הרכבת הקלה בגוש דן
The Green Line is under construction between Rishon LeZion and Holon in the south, central Tel Aviv and Herzliya in the north. The planned route is 39 kilometres, including 4.5 kilometres underground. NTA targets the southern section for 2028 and the full line for 2030; these are scheduled openings, not completed service.
Sources:12Tel Aviv Metro (M1, M2, M3)מטרו גוש דן
The planned Tel Aviv Metro comprises three lines, about 150 kilometres and 109 stations across the metropolitan area. M1 is planned at 85 kilometres with 62 stations. Procurement and preparatory works are underway. NTA opened prequalification for Infra 2 works in August 2026, with submissions due in January 2027. Passenger service has not begun.
Sources:12Tel Aviv-Jerusalem High-Speed Railway (A1)מסילת הרכבת המהירה תל אביב-ירושלים
Israel Railways National Electrification Programפרויקט החשמול של רכבת ישראל
Acre-Karmiel Railwayמסילת הרכבת עכו-כרמיאל
Rishon LeZion-Modi'in Railwayמסילת ראשון לציון-מודיעין
Kiryat Shmona Railway Extensionהרחבת מסילת הרכבת לקריית שמונה
The planned extension from Karmiel would bring passenger rail to Kiryat Shmona and the Upper Galilee. The government’s June 2026 northern recovery programme prioritises advancing the project. It is not an operating railway, and a confirmed opening date has not been established.
Sources:1Dimona-Eilat Railway (Med-Red)מסילת הרכבת לאילת
The proposed railway would extend passenger and freight links through the Negev and Arava to Eilat. Netivei Israel is responsible for planning the southern extensions.
Sources:1Jerusalem Light Rail Red Line Extensionהרחבת הקו האדום של הרכבת הקלה בירושלים
Jerusalem Light Rail Green Lineהקו הירוק של הרכבת הקלה בירושלים
Jerusalem Light Rail Blue Lineהקו הכחול של הרכבת הקלה בירושלים
Haifa-Nazareth Light Rail (Nofit)נופית - הרכבת הקלה חיפה-נצרת
Alstom, Electra and Minrav reached financial close for Nofit on 28 July 2026. The project will connect Haifa and Nazareth through a 41-kilometre light-rail route with 20 stations. Construction and systems delivery remain underway.
Sources:1Beersheba Light Railהרכבת הקלה בבאר שבע
Beersheba’s planned light-rail network includes a connection to the IDF intelligence campus at Likit. On 14 May 2026, the prime minister adopted the interministerial recommendation to use light rail, rather than bus rapid transit, on the Beersheba–Likit corridor.
Sources:1Haifa Bayport Terminal (SIPG)נמל המפרץ חיפה
Ashdod South (Hadarom) Container Terminalנמל הדרום באשדוד
Haifa Port Privatization (Adani-Gadot)הפרטת נמל חיפה
Ramon Airportנמל התעופה רמון
Ramon Airport, north of Eilat, is named for astronaut Ilan Ramon and his son Assaf. Eilat’s city airport transferred its operations there on 18 March 2019. Ramon also replaced Ovda’s civilian passenger operations.
Sources:1Ben Gurion Airport Terminal 3 Expansionהרחבת טרמינל 3 בנתב"ג
Highway 6 (Trans-Israel) Northern Extensionהרחבת כביש 6 צפונה
Highway 16 (Jerusalem Western Entrance / Yitzhak Shamir Boulevard)כביש 16 - הכניסה המערבית לירושלים
Highway 16 opened on 31 August 2022 as a western entrance to Jerusalem. The six-kilometre road connects the Motza area to the city through four tunnels, seven bridges and three interchanges.
Sources:1Connecting Israel 2040 Rail Programתוכנית 'מחברים את ישראל'
Government decision 855 of July 2023 set out a national railway expansion extending toward Kiryat Shmona and Eilat. It combines high-speed and regional corridors. Individual projects have separate planning, funding and construction stages; the programme is not a completed nationwide network.
Sources:1Energy
18 entries
Natural gas, electricity generation, solar power, storage and proposed international connections.
Leviathan Natural Gas Fieldשדה הגז לוויתן
Tamar Natural Gas Field (Phase 1 Expansion)שדה הגז תמר
Chevron announced completion of Tamar’s production expansion on 16 June 2026. A third subsea pipeline and three compressors at Ashdod increased capacity from about 1.1 to 1.6 billion cubic feet per day.
Sources:1Karish Field and Energean Power FPSOשדה הגז כריש
Katlan Area Development (Athena, Zeus, Hera, Apollo)פיתוח קטלן
Katlan is Energean’s offshore development linking new gas fields to the Energean Power vessel. Its first phase covers Athena and Zeus. The company’s September 2026 report kept first gas targeted for the first half of 2027; Hera and Apollo belong to a later phase.
Sources:1Nitzana Export Pipelineצינור הגז ניצנה
The planned Ramat Hovav–Nitzana pipeline would add a gas-export route to Egypt. Government plans describe about 66 kilometres of onshore pipe and a compressor station. Its construction forms part of the infrastructure needed for expanded Leviathan exports; it is not yet an operating export route.
Sources:12EMG Pipeline Expansion + Ashdod-Ashkelon Linkהרחבת צינור EMG וצינור אשדוד-אשקלון
Israel-Egypt $35B Gas Export Dealעסקת היצוא לגז למצרים
In August 2025 the Leviathan partners agreed to sell about 130 billion additional cubic metres of gas to Egypt, with estimated revenue of $35 billion. Israel approved the exports in December 2025. Deliveries are phased and depend on production and pipeline expansion; the headline value is not revenue already received.
Sources:1Project Prosperity (Green and Blue)פרויקט שגשוג ירוק וכחול
The 2022 proposal paired 600 MW of Jordanian solar generation with 200 million cubic metres of Israeli desalinated water annually, with UAE participation. Jordan said in November 2023 that it would not sign the implementation deal during the Gaza war following Hamas’s October 7 attack. The proposed exchange is not operating.
Sources:12Ashalim Solar Complexתחנת הכוח אשלים
Dimona Solar Power Plant (EDF)תחנת הכוח הסולארית דימונה
EDF’s 265 MW photovoltaic project near Dimona reached financial close in 2026. The site covers about 3,000 dunams. The project’s legal adviser describes roughly two years of construction followed by about 25 years of operation; the planned capacity is not electricity already being generated.
Sources:12Mandatory Rooftop Solar Regulationתקנות חובת התקנת מערכות סולאריות על גגות
Rules effective 11 December 2025 require solar panels on qualifying new detached homes with roofs over 100 m² and new non-residential buildings with roofs over 250 m², subject to exemptions. Other new residential buildings require preparation for future installation.
Sources:11.5 GW National Battery Storage Tenderמכרז אגירת חשמל ארצי 1.5 ג'יגה-וואט
Kochav HaYarden Pumped Storage Plantתחנת הכוח האגירה כוכב הירדן
Kochav HaYarden’s 344 MW pumped-storage facility joined the grid in February 2025. It stores energy by pumping water uphill and generates electricity when the water flows back through turbines. It complements the 300 MW Gilboa plant.
Sources:1Manara Cliff Pumped Storage Plantתחנת הכוח האגירה מצוקי מנרה
The 156 MW Manara pumped-storage plant remains under construction in the Upper Galilee. Ellomay’s August 2026 report says work across the site is progressing, while negotiations continue over compensation for war-related delays and changes to financing.
Sources:1Genesis Wind Farm (Golan Heights)חוות הרוח 'בראשית' ברמת הגולן
Enlight’s Genesis Wind farm in the Golan Heights has 207 MW of generating capacity and entered commercial operation in October 2023. Its electricity output varies with wind conditions; installed megawatts are a capacity measure rather than continuous generation.
Sources:1IEC Privatization + 2023-2027 Grid Investment Planרפורמת חברת החשמל ותכנית פיתוח הרשת
The 2018 electricity reform separated system management into Noga and required sales of IEC power stations to private producers. IEC retains major transmission and distribution responsibilities. Since July 2024, households can choose an electricity supplier even without a smart meter; network infrastructure remains regulated.
Sources:123Great Sea Interconnector (Israel-Cyprus-Greece HVDC)כבל החשמל הים-תיכוני
EastMed Gas Pipelineצינור הגז EastMed
EastMed–Poseidon is a proposed gas-pipeline connection from the eastern Mediterranean through Cyprus and Greece to Italy. Developer IGI Poseidon describes a roughly 2,100-kilometre combined route and design capacity of 12–20 billion cubic metres annually. It remains a development project rather than an operating pipeline.
Sources:1Water
9 entries
Desalination, wastewater treatment and reuse, reservoirs and water transmission systems.
Water from the Mediterranean
Annual supply · million cubic metres
- Sorek B Desalination Plant200
- Sorek A Desalination Plant150
- Hadera Desalination Plant137
- Ashkelon Desalination Plant120
Selected operating plants, figures reported by IDE in 2025. Planned expansions are excluded.
Sources:12Sorek B Desalination Plantמתקן ההתפלה שורק ב
Sorek B, also called Be’er Miriam, supplies desalinated seawater to the national network. IDE announced that it was operating in March 2025, with annual output of 200 million cubic metres. Its reverse-osmosis process uses steam-driven high-pressure pumps and an on-site power station.
Sources:1Sorek A Desalination Plantמתקן ההתפלה שורק א
Sorek A began operating in 2013 on the Mediterranean coast south of Tel Aviv. The seawater reverse-osmosis plant has a contracted annual supply of about 150 million cubic metres. It is a separate facility from the neighbouring Sorek B plant.
Sources:1Ashkelon Desalination Plantמתקן ההתפלה אשקלון
Hadera Desalination Plantמתקן ההתפלה חדרה
Hadera’s seawater reverse-osmosis plant, beside the Orot Rabin power station, entered operation in 2010. IDE lists annual supply of 137 million cubic metres. It feeds Israel’s national water system alongside the other coastal desalination plants.
Sources:1Palmachim Desalination Plantמתקן ההתפלה פלמחים
Palmachim began operating in 2007 and was expanded in 2010 and 2013. BlueGen operates the seawater reverse-osmosis plant; its investor Generation Capital lists a 51% holding through BlueGen and maximum annual capacity of 105 million cubic metres. The build–own–operate arrangement keeps the facility in private ownership after the concession period.
Sources:12Western Galilee (Birkat Miriam) Desalination Plantמתקן ההתפלה מערב הגליל – ברכת מרים
IDE is building the Western Galilee desalination plant, also called Birkat Miriam, with contracted annual capacity of 100 million cubic metres. The European Investment Bank signed a €150 million loan for it in 2023. The US Commerce Department’s March 2026 guide expected operation in early 2027.
Sources:123Shafdan Wastewater Treatment & Reuseמפעל השפד"ן
Shafdan treats wastewater from the Dan metropolitan area for reuse in agriculture. Mekorot describes further filtration through soil and an aquifer, followed by delivery through the Third Line to the Negev. The company reports that this line carries about 140 million cubic metres of reclaimed water annually.
Sources:12National Water Carrier Flow-Reversalהיפוך זרימת המוביל הארצי
Mekorot’s flow-reversal project sends desalinated Mediterranean water north through pipelines, pumping stations and reservoirs toward the Sea of Galilee. The company dates initial operation to early 2023. The system supports water supply in northern Israel and the lake, alongside Israel’s water commitments to Jordan.
Sources:1Project Prosperity (Israel-Jordan Water-for-Energy)פרויקט שגשוג ירוק-כחול
The 2022 proposal paired 600 MW of Jordanian solar generation with 200 million cubic metres of Israeli desalinated water annually, with UAE participation. Jordan said in November 2023 that it would not sign the implementation deal during the Gaza war following Hamas’s October 7 attack. The proposed exchange is not operating.
Sources:12Digital & Communications
6 entries
Mobile networks, fiber broadband, data centers, subsea cables and online public services.
Nationwide Fiber-to-the-Home Rolloutפריסת סיבים אופטיים ארצית
Israel’s fibre rollout connects homes and businesses to high-speed fixed broadband. At the end of June 2026, Bezeq reported 3.028 million homes passed by its fibre network and 1.061 million retail and wholesale fibre subscriptions. Homes passed measures network reach, while subscriptions measure take-up.
Sources:1Nationwide 5G Rolloutפריסת רשת 5G ארצית
Israel’s mobile operators have offered commercial 5G since 2020. In July 2026, a Communications Ministry advisory team recommended measures to remove deployment barriers and improve coverage. The retirement of 2G and 3G involved extensions into 2026, so the original December 2025 shutdown date did not apply uniformly.
Sources:123Blue-Raman Subsea Cable Systemכבל תת-ימי בלו-ראמן
Google and Sparkle’s Blue–Raman project is designed to link southern Europe and India through Israel and Jordan. Blue serves the Mediterranean route via Italy, France, Greece and Israel; Raman extends through Jordan, Saudi Arabia, Djibouti and Oman to India. Together they provide a route distinct from the established Egyptian corridor.
Sources:122Africa Cable System (Regional Connectivity)מערכת הכבלים התת-ימיים 2Africa
2Africa connects Africa with Europe and the Middle East, without a direct Israeli landing. Meta announced completion of the core system in November 2025; its announcement scheduled the separate Pearls extension for 2026.
Sources:1Gov.il Digital Government Programישראל דיגיטלית - gov.il
Gov.il brings government information and online services together. The MyGov personal area uses national digital identification to provide access to personal documents, applications and services from participating public bodies.
Sources:1DigiTel and Tel Aviv Smart City Programדיגיתל - תל אביב עיר חכמה
Tel Aviv-Yafo’s DigiTel resident service combines municipal updates, benefits and a personal service area. Residents aged 14 and over can join; services include municipal tax, parking, education and tracking requests to the city.
Sources:1Housing & Reconstruction
5 entries
Housing plans, urban renewal and reconstruction in communities affected by Hamas and Hezbollah attacks.
Tekuma Directorate, Gaza-Envelope Reconstructionמנהלת תקומה
Tekuma coordinates recovery of Gaza-border communities after Hamas’s October 7, 2023 attack. Its September 2026 update reported over 90% of residents back, while return to Be’eri was planned in stages through July 2027 and to Nir Oz from late 2027.
Sources:1Northern Rehabilitation Plan (Tenufa / Tekuma North)תוכנית שיקום הצפון
Northern rehabilitation covers housing, public services and local economic recovery after Hezbollah’s attacks and the evacuation of border communities. Government decision 4238, adopted in June 2026, sets a regional development program for 2026–2030; approved budgets do not by themselves establish completion of individual projects.
Sources:1Sde Dov Redevelopment (TA/4444)פינוי שדה דב
Holon Urban Renewal Master Planתוכנית ההתחדשות העירונית בחולון
Holon’s H/619 framework guides renewal of older neighborhoods through rebuilding or strengthening existing buildings. It links development rights to street character, public space and transport corridors; individual projects still require the relevant planning approvals and permits.
Sources:1National housing planningתוכנית הדיור הלאומית
The Planning Administration’s 2025 yearbook records approval of 223,164 housing units, including 25,279 approved by local planning bodies. Planning approvals, building permits, construction starts and completed homes are different measures; this figure does not count homes delivered to residents.
Sources:1Defense & Security
15 entries
Air defense, border barriers, military campuses, protected hospitals and civilian shelters.
Iron Dome Battery Network & Tamir Productionכיפת ברזל
David's Sling (Magic Wand)שרביט קסמים
David’s Sling is an operational layer of Israel’s air defense, developed jointly with the United States. The US Missile Defense Agency reported successful upgrade tests in February 2026 against scenarios involving rockets, missiles, aircraft and drones, drawing on combat experience.
Sources:1Arrow 3 Exo-Atmospheric Interceptorחץ 3
Arrow 4 Next-Generation Interceptorחץ 4
Iron Beam (Or Eitan) Laser Defenseאור איתן
The first Iron Beam high-power laser system was delivered to the IDF on December 28, 2025. Developed by Rafael with an Elbit laser source, it is intended to complement missile defenses against rockets, mortars and drones; delivery of the first unit does not mean nationwide coverage.
Sources:1Gaza Border Barrier (Above + Underground)מכשול ההגנה מול רצועת עזה
Egypt-Sinai Border Fenceגדר ישראל-מצרים
Israel completed its security fence along the Egyptian border in 2013. Physical barriers, surveillance and border patrols work together to detect and prevent unauthorized crossings; the fence is one component of border defense, rather than a barrier to aerial threats.
Sources:1Lebanon Border Wall & Buffer-Zone Fortificationsמכשול הגבול הצפוני
The government’s 2026 infrastructure program lists a wall-type barrier along the Lebanon border as under construction. This physical project is distinct from IDF deployments in southern Lebanon, which the IDF described in September 2026 as protection against Hezbollah attacks and renewed military infrastructure.
Sources:12Jordan Border Security Barrierמכשול הגבול עם ירדן
Construction of the eastern security barrier began in December 2025 on two sections totaling about 80 km. The Defense Ministry describes a planned roughly 500 km system from the southern Golan to north of Eilat, costing an estimated NIS 5.5 billion; later sections remain phased work.
Sources:1Ir HaBahadim (City of Training Bases)עיר הבה"דים
The Ariel Sharon training campus near Yeruham began operating in May 2015 and completed its initial move-in in summer 2016. It brings seven IDF training schools together, including military medicine, logistics, communications, military police and personnel; it is separate from the newer intelligence and technology campuses.
Sources:1IDF Southern Tech Campus & Command Relocation, Beershebaקריית המודיעין והטכנולוגיה בנגב
The Beersheba communications campus is part of the IDF’s move south. Contractor Shikun & Binui reported initial operation in April 2026, while its separate intelligence campus remained under construction; the two projects should not be treated as a single completed base.
Sources:1Soroka Medical Center Expansion & Underground Hospitalהרחבת המרכז הרפואי סורוקה
Soroka’s reconstruction follows the Iranian missile strike of June 2025. A development plan approved in 2026 includes a protected inpatient building and additional towers; the government’s NIS 360 million allocation for 2026–2030 is a funding contribution, not the total cost or proof of completed construction.
Sources:1Tel Aviv Sourasky (Ichilov) Alrov Tower & Underground Hospitalהמגדל הרפואי החדש איכילוב
Ichilov’s planned underground hospital in the Alrov tower has a $10 million Helmsley grant. The donor’s October 2025 announcement describes 250 beds, expandable to 400, on a parking level designed for conversion to emergency use within 24 hours; it describes planned capacity.
Sources:1National Public Shelter & Mobile-Shelter Programתוכנית המקלטים הציבוריים
Israel’s shelter programs include public-shelter repairs, mobile shelters and protected rooms in homes. In September 2026 the Defense Ministry announced expansion of the Northern Shield program to eligible communities within 9 km of Lebanon, with self-build grants of up to NIS 182,000 subject to eligibility.
Sources:1Shimon Peres Negev Nuclear Research Center (Dimona) Expansionהקריה למחקר גרעיני נגב, דימונה
Satellite images examined by the Associated Press in September 2025 showed substantial construction at the Dimona research center. Experts disagreed about the new structure’s purpose, and Israel did not publicly confirm it; the available evidence does not establish a new reactor’s completion or operation.
Sources:1