Netanya’s new bridge: from plan to opening
Netanya’s Havatzelet bridge, from the 2023 tender to its September 2026 opening, and the distinction between planned housing and finished homes.
Video published:
In this video
Video transcript
Netanya’s Havatzelet bridge has moved from a 2023 building tender to an open connection for the city’s north.
The project links the Gold Coast neighborhood to Route 2, the Coastal Highway. Its reported cost is about 60 million shekels.
The city is developing transport access alongside a district planned for about 3,400 homes. That is a planned total, not a count of finished homes. The opening was reported in September 2026.