Skip to main content

Israel Buries 80% of Its Waste as Landfill Capacity Nears Its Limit

Courtroom-sketch editorial illustration of large mixed-waste piles filling an industrial sorting hall beneath steel rafters and high windows.

Israel sends about 80% of its waste to landfill, nearly twice the OECD average, and existing sites are expected to fill within a few years. University of Haifa professor Ofira Ayalon said roughly 40% of the refuse is organic material that produces methane and can leach heavy metals into groundwater when buried with other waste. Billions of shekels collected through landfill levies remain in the Cleanliness Fund. Environmental Protection Minister Idit Silman is at odds with ministry professionals over a proposed Waste Authority as the country seeks alternatives to expanding landfill sites.

Sources

Secondary sources:1

Related stories

  1. Hiriya Chair Warns Frozen Cleanliness Fund Could Halt Recycling Systems
  2. Interministerial Report Urges National Oil-Spill Response System
  3. Magnitude-5.2 Earthquake Near Suez Felt in Israel

Something went wrong

We couldn't complete that action. Check your connection and try again.